News
While the Mumbai Trans Harbour Link (MTHL), which links Sewri with Chirle near Nhava Sheva, is boosting connectivity for motorists, the proposed elevated corridor connecting Chirle with the ...
Mumbai-Pune Expressway, ₹1,100 crore elevated corridor project will improve traffic flow and reduce congestion. It is managed by MMRDA, and will connect the Mumbai Trans Harbour Sealink (MTHL ...
Rs 1102-cr elevated corridor linking MTHL to Mumbai-Pune expressway gaining steam Updated on: 28 June,2025 08:16 AM IST | Mumbai Ranjeet Jadhav | [email protected] ...
MUMBAI: The Mumbai-Pune-Hyderabad high-speed bullet train corridor project is set to get a boost. Work on the Detailed Project Report (DPR) for alignment of the 711-km train corridor will begin ...
The second Mumbai project, a 10.3 km elevated Dahisar-Mira Bhayander metro-9 corridor, would comprise eight stations. Metro-9 is expected to be completed by 2022, and the cost of the project is ...
15 High-Risk Spots On Old Mumbai-Pune Highway Upgraded Under Zero Fatality Corridor Initiative The upgrades are part of SaveLIFE’s Zero Fatality Corridor programme, aimed at addressing the root ...
A semi high-speed train corridor between Mumbai and Pune being planned to reduce travel time to 90 minutes. The ridership survey for the Mumbai to Nagpur corridor is completed. Saturday, Jun 21, 2025 ...
Total vehicles on the Mumbai-Pune expressway per day: 45,000 to 50,000; Total length of the missing link: 13.3 km; Total cost of the project: Rs 4,800 crore; Number of tunnels: 2; Number of bridges: 2 ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results